{
  "resourceType": "CodeSystem",
  "id": "v2-0472",
  "meta": {
    "profile": [
      "http://hl7.org/fhir/StructureDefinition/shareablecodesystem"
    ]
  },
  "text": {
    "status": "additional",
    "div": "<div xmlns=\"http://www.w3.org/1999/xhtml\">\n            <p>TQ Conjunction ID</p>\n\n            <table class=\"grid\">\n              <tr>\n                <td>\n                  <b>Code</b>\n                </td>\n                <td>\n                  <b>Description</b>\n                </td>\n                <td>\n                  <b>Nederlands (Dutch)</b>\n                </td>\n                <td>\n                  <b>Comment</b>\n                </td>\n                <td>\n                  <b>Version</b>\n                </td>\n              </tr>\n              <tr>\n                <td>A\n                  <a name=\"A\"> </a>\n                </td>\n                <td>Asynchronous</td>\n                <td>Asynchroon</td>\n                <td>Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time).  The conjunction of &quot;A&quot; specifies two parallel instructions, as are sometimes used in medication, e.</td>\n                <td>added v2.4</td>\n              </tr>\n              <tr>\n                <td>C\n                  <a name=\"C\"> </a>\n                </td>\n                <td>Actuation Time</td>\n                <td>Actuatietijd</td>\n                <td>It will be followed by a completion time for the service.  This code allows one to distinguish between the time and priority at which a service should be actuated (e.g. blood should be drawn) and the time and priority at which a service should be complet</td>\n                <td>added v2.4</td>\n              </tr>\n              <tr>\n                <td>S\n                  <a name=\"S\"> </a>\n                </td>\n                <td>Synchronous</td>\n                <td>Synchroon</td>\n                <td>Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An &quot;S&quot; specification implies that the second timing sequence follows the first, e.g. when a service request is</td>\n                <td>added v2.4</td>\n              </tr>\n            </table>\n\n          </div>"
  },
  "extension": [
    {
      "url": "http://hl7.org/fhir/StructureDefinition/structuredefinition-ballot-status",
      "valueString": "External"
    },
    {
      "url": "http://hl7.org/fhir/StructureDefinition/structuredefinition-fmm",
      "valueInteger": 0
    }
  ],
  "url": "http://hl7.org/fhir/v2/0472",
  "identifier": {
    "system": "urn:ietf:rfc:3986",
    "value": "urn:oid:2.16.840.1.113883.18.300"
  },
  "version": "2.8.2",
  "name": "v2 TQ Conjunction ID",
  "status": "active",
  "experimental": false,
  "publisher": "HL7, Inc",
  "contact": [
    {
      "telecom": [
        {
          "system": "url",
          "value": "http://hl7.org"
        }
      ]
    }
  ],
  "description": "FHIR Value set/code system definition for HL7 v2 table 0472 ( TQ Conjunction ID)",
  "caseSensitive": false,
  "valueSet": "http://hl7.org/fhir/ValueSet/v2-0472",
  "content": "complete",
  "concept": [
    {
      "extension": [
        {
          "url": "http://hl7.org/fhir/StructureDefinition/codesystem-comments",
          "valueString": "Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time).  The conjunction of \"A\" specifies two parallel instructions, as are sometimes used in medication, e."
        }
      ],
      "code": "A",
      "display": "Asynchronous",
      "designation": [
        {
          "language": "nl",
          "value": "Asynchroon"
        }
      ]
    },
    {
      "extension": [
        {
          "url": "http://hl7.org/fhir/StructureDefinition/codesystem-comments",
          "valueString": "It will be followed by a completion time for the service.  This code allows one to distinguish between the time and priority at which a service should be actuated (e.g. blood should be drawn) and the time and priority at which a service should be complet"
        }
      ],
      "code": "C",
      "display": "Actuation Time",
      "designation": [
        {
          "language": "nl",
          "value": "Actuatietijd"
        }
      ]
    },
    {
      "extension": [
        {
          "url": "http://hl7.org/fhir/StructureDefinition/codesystem-comments",
          "valueString": "Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An \"S\" specification implies that the second timing sequence follows the first, e.g. when a service request is"
        }
      ],
      "code": "S",
      "display": "Synchronous",
      "designation": [
        {
          "language": "nl",
          "value": "Synchroon"
        }
      ]
    }
  ]
}